Monday, March 3, 2008

LINK: Crazy angry Bengal fans are funnier and less dangerous than crazy angry Bengals players.


Over at First and Ten Inches, a funny look at some Bengals fans' reactions to the League blocking the Shaun Rogers trade. As long as nobody tells Odell Thurman about this trade, I'm pretty sure we're safe.

Have a link, tip, or post from your own blog that you'd like us to throw up? Send it on to THROWINGINTOTRAFFIC[at]GMAIL[dot]COM.

1 comment:

Anonymous said...

Good afternoon


Quality assurance is implemented at the schematic design stage. Mansour Engineering’s quality assurance is an inclusive review of each discipline as well as an overall discipline coordination. Quality assurance procedures include analysis of the worst case scenario for verification of specific design parameters and for each discipline’s task. Project management overview integrates schedule and cost control into each and every aspect of design. Mansour Engineering project management objective is to develop a design that satisfies all requirements and is economically feasible to construct. To that end, cost estimating is within the preview and capabilities of each discipline project leader. Without sacrificing quality control or cost control, Mansour Engineering understands that scheduling is of the utmost importance. Mansour Engineering prepare a detailed timeline for each item on the project deliverable list and proceed on schedule by adjusting manpower activity to finish on time.

[url=http://www.mansour.ca] click here to go to Mansour Engineering[/url]


http://www.mansour.ca